[Frontend] Interface kurikulum untuk admin
No child items are currently assigned. Use child items to break down this issue into smaller parts.
Link issues together to show that they're related. Learn more.
Activity
- Kurniandha Sukma Yunastrian added Sprint Backlog label
added Sprint Backlog label
- Ranindya Paramitha changed milestone to %Sprint 2
changed milestone to %Sprint 2
- Ranindya Paramitha changed time estimate to 5h
changed time estimate to 5h
- Kurniandha Sukma Yunastrian added On Going Product Backlog label and removed Sprint Backlog label
added On Going Product Backlog label and removed Sprint Backlog label
- Kurniandha Sukma Yunastrian removed On Going Product Backlog label
removed On Going Product Backlog label
- Kurniandha Sukma Yunastrian removed milestone %Sprint 2
removed milestone %Sprint 2
- Gabriel Jonathan added Sprint Backlog label
added Sprint Backlog label
- Gabriel Jonathan added Frontend label
added Frontend label
- Gabriel Jonathan changed title from Interface kurikulum untuk admin (frontend) to [Frontend] Interface kurikulum untuk admin
changed title from Interface kurikulum untuk admin (frontend) to [Frontend] Interface kurikulum untuk admin
- Gabriel Jonathan changed the description
changed the description
- Gabriel Jonathan changed due date to April 20, 2021
changed due date to April 20, 2021
- Hasna Karimah assigned to @karimahasna
assigned to @karimahasna
- Hasna Karimah added WIP label and removed Sprint Backlog label
added WIP label and removed Sprint Backlog label
- Hasna Karimah added 1h of time spent at 2021-04-18
added 1h of time spent at 2021-04-18
- Hasna Karimah added 4h of time spent at 2021-04-20
added 4h of time spent at 2021-04-20
- Owner
4h to make interface admin and create add curriculum
- Hasna Karimah mentioned in merge request !109 (merged)
mentioned in merge request !109 (merged)
- Hasna Karimah mentioned in commit 01795371
mentioned in commit 01795371
- Kurniandha Sukma Yunastrian added Review and Test label and removed WIP label
added Review and Test label and removed WIP label
- Kurniandha Sukma Yunastrian added 15m of time spent at 2021-04-21
added 15m of time spent at 2021-04-21
- Author Owner
15m to review
- Kurniandha Sukma Yunastrian closed
closed
- Kurniandha Sukma Yunastrian removed Review and Test label
removed Review and Test label
- Hasna Karimah added 15m of time spent at 2021-04-21
added 15m of time spent at 2021-04-21
- Owner
15m to fixing